Texas Instruments TUSB1146EVM Evaluation Module (EVM)
Texas Instruments TUSB1146EVM Evaluation Module (EVM) is configured to evaluate the operation of the TUSB1146 USB Type-C™ alternate mode Re-driving Switch. The TI TUSB1146EVM can be used with a legacy DP source and/or USB host system to evaluate the USB 3.2 Gen 2 Type-C implementation. The TUSB1146EVM includes jumpers, allowing for easy device configuration.Features
- Powered by VBUS or external power supply
- Jumpers for easy device configuration
- It can be used with any USB or DP source and device/sink
Overview
Block Diagram
เผยแพร่แล้ว: 2563-06-23
| อัปเดตแล้ว: 2567-06-26
