Texas Instruments TUSB1064Q1-EVM USB Type-C® Evaluation Module
Texas Instruments TUSB1064Q1-EVM USB Type-C® Evaluation Module (EVM) can be used with an alternate mode, USB Type-C source such as the TUSB1146EVM or USB, or the DisplayPort™, Type-C Host system to evaluate the Type-C implementation. The evaluation module has a legacy Type-A USB receptacle to connect to a USB hub or device and a DisplayPort receptacle to connect to the DisplayPort sink. The Texas Instruments TUSB1064Q1-EVM uses the TPS65987 PD controller for CC pin control and to configure the device in I2C or pin-strap mode.Features
- USB Type-C crosspoint switch supporting
- USB 3.1 Gen 2 + 2 DP 1.4 lanes
- 4 DP 1.4 lanes
- USB 3.1 Gen 2 up to 10Gbps
- DisplayPort 1.4 up to 8.1Gbps (HBR3)
- VESA DisplayPort alt mode UFP_D redriving crosspoint switch supporting pin assignments C, D, and E
- Ultra-low-power architecture
Applications
- PC and notebooks
- TV
- Gaming
- Home theater and entertainment
- Smartphones
- Tablets
- Automotive infotainment
Board Layout
เผยแพร่แล้ว: 2568-03-17
| อัปเดตแล้ว: 2568-03-25
