Texas Instruments TPSM81033EVM-035 Evaluation Module (EVM)
Texas Instruments TPSM81033EVM-035 Evaluation Module (EVM) is designed to provide a quick setup to evaluate the TPSM81033 device with the output voltage set to 5V. The TPSM81033 is a synchronous boost module. The device offers a power supply design for portable equipment and smart devices powered by various batteries and other power supplies. The Texas Instruments TPSM81033 has a 5.5A (typ.) valley switch current limit over the full temperature range.Features
- Input voltage range of 1.8V to 5.5V
- Output voltage range of 2.2V to 5.5V
- Pin-selectable auto PFM or forced PWM mode at light load
- True disconnection between input and output during shutdown
Applications
- Optical module
- Patient monitor
- Smart meter
Board Layout
เผยแพร่แล้ว: 2568-03-17
| อัปเดตแล้ว: 2568-03-21
