Texas Instruments TPS929160EVM Driver Evaluation Module (EVM)
Texas Instruments TPS929160EVM Driver Evaluation Module (EVM) helps the user evaluate the features of the TPS929160-Q1. The TPS929160-Q1 is an automotive 16-channel LED driver with a FlexWire interface to address the increasing need for individual control of each LED string. The Texas Instruments TPS929160EVM comes with a TPS929120CANEVM evaluation board if the user wants to connect to the TPS929160-Q1 with a CAN transceiver.Kit Contents
- USB2ANY
- Ribbon cable
- USB cable
- TPS929160EVM evaluation module
- TPS929120CANEVM evaluation module
- DB-09 cable
Required Equipment
- PC with TPS929160EVM GUI installed or to run the online TPS929160EVM GUI
- 12V DC power supply
Hardware Setup Without CAN
Hardware Setup With CAN
เผยแพร่แล้ว: 2566-04-06
| อัปเดตแล้ว: 2566-04-12
