Texas Instruments TPS7H500xEVM Evaluation Modules

Texas Instruments TPS7H500xEVM Evaluation Modules demonstrate how the TPS7H500x-SEP controller can be operated in an open loop and supports a test platform to operate the product. The evaluation modules feature synchronous rectification outputs with adjustable dead time and a configurable duty-cycle limit. The TI TPS7H500xEVM Evaluation Modules are ideal for space satellite isolated power supplies.

Features

  • Synchronous rectification outputs with adjustable dead time
  • Adjustable slope compensation and soft start
  • Configurable duty-cycle limit
  • 0.613V ±1% voltage-reference overtemperature, radiation, and line and load

Applications

  • Space satellite isolated power supplies
  • Radiation hardened applications
  • Space satellite payloads

Overlay

Location Circuit - Texas Instruments TPS7H500xEVM Evaluation Modules

Schematics

เผยแพร่แล้ว: 2565-03-30 | อัปเดตแล้ว: 2565-06-15