Texas Instruments TPS746EVM-009 Regulator Evaluation Module (EVM)
Texas Instruments TPS746EVM-009 Regulator Evaluation Module (EVM) is designed for a typical configuration to evaluate the operation and performance of the TPS746. The Texas Instruments TPS746 is a 1A, low-Vin, low-dropout (LDO) voltage regulator with power good. The evaluation module circuit board is configured to be a reference design for engineering applications requiring current to a dynamic load of up to 1A.Features
- 1.5V to 6V input voltage range
- 190mV (max) at 1A low dropout
- 25µA (typ.) low quiescent current
- 1% over temperature high accuracy
- Power Good
Board Layout
เผยแพร่แล้ว: 2561-05-23
| อัปเดตแล้ว: 2568-03-06
