Texas Instruments TPS650360EVM PMIC Evaluation Module (EVM)
Texas Instruments TPS650360EVM PMIC Evaluation Module (EVM) is designed for the TPS65036x-Q1 power management IC (PMIC) devices. The Texas Instruments TPS650360EVM includes an onboard USB-to-I2C adapter, power terminals, and jumpers for all DC regulator inputs and outputs, and test points for common measurements.Features
- Programmable output voltages
- Programmable power up and down sequencing
- Programmable spread-spectrum On or Off
Applications
- Automotive camera modules
- Surround view camera modules
- Rearview camera modules
- DMS (driver monitoring systems)
- Power over coax (POC) camera modules
- E-mirror camera modules
- Safety MCU power
- OBC, DC/DC, zonal controller
- Inverter and motor control (traction inverter)
- Heating and cooling (automotive HVAC compressor module)
- Automotive radar modules
- Ultra-short range radar
- Kick-to-open
- Park assist and automated parking
- Driver monitor systems
- Vehicle occupancy detection, child presence detection (CPD)
- Vehicle intruder detection
- Seat belt monitoring
Kit Contents
- TPS650360EVM evaluation module
- USB-A male to USB-C™ male cable
Board Layout
เผยแพร่แล้ว: 2568-03-14
| อัปเดตแล้ว: 2568-10-29
