Texas Instruments TPS61288EVM-064 Evaluation Module

Texas Instruments TPS61288EVM-064 Evaluation Module is an evaluation module (EVM) to test the TPS61288 Boost Converter's performance. The TPS61288 is an 18V, 15A synchronous boost converter that integrates two low on-resistance power FETs: A 6.5mΩ switching FET and an 8.5mΩ rectifier FET.

The TI TPS61288EVM-064 Evaluation Module features a wide input voltage ranging from 2.0V (2.4V rising) to 18V, supports the typical applications powered by the single-cell Li-ion battery, multi-cell Li-ion batteries, or regulated 3.3V, 5V, and 12V power rail.

Features

  • Input voltage range of 2.0V to 18V
  • Output voltage range of 4.5V to 18V
  • Peak current limit of 15A (min.)
  • 2.5mm x 3mm Hotrod package

Layout

Texas Instruments TPS61288EVM-064 Evaluation Module
เผยแพร่แล้ว: 2564-01-08 | อัปเดตแล้ว: 2565-03-11