Texas Instruments TPS563211EVM Converter Evaluation Module (EVM)

Texas Instruments TPS563211EVM Converter Evaluation Module (EVM) is a fully assembled and tested circuit for evaluating the TPS563211. The TPS562311 is a simple, easy-to-use, 2A synchronous step-down converter with Eco-mode and FCCM selectable in the SOT-583 package. The Texas Instruments TPS562211EVM operates from 4.2V to 18V input (12V nominal) and provides a 3.3V output at 3A. It also includes AC signal injection terminals for feedback loop measurements.

Features

  • AECM control for fast transient response and fixed-frequency
  • Mode pin for Eco-mode and FCCM selection
  • Supports all-ceramic output capacitors
  • Good output accuracy
  • SOT-583 package

Board Layout

Mechanical Drawing - Texas Instruments TPS563211EVM Converter Evaluation Module (EVM)
เผยแพร่แล้ว: 2563-11-13 | อัปเดตแล้ว: 2567-09-24