The TI TPS562207EVM operates from 4.5V to 17V input (12V nominal) and provides a 1.05V output at 2A. The Evaluation Module also includes AC signal injection terminals for feedback loop measurements.
Features
- 4.5V to 17V input voltage range
- 0.6V to 7V output voltage range
- Up to 2A output current
- FCCM, forced-CCM
- Fast transient response
- 1.6mm x 1.6mm DRL package
Connectors and jumpers placement
เผยแพร่แล้ว: 2563-10-12
| อัปเดตแล้ว: 2567-08-30

