Texas Instruments SMARTDAC-DIY-EVM Evaluation Module

Texas Instruments SMARTDAC-DIY-EVM Evaluation Module is a supplemental board developed for prototype building and performance evaluation of all smart DAC EVMs. The SMARTDAC-DIY-EVM includes all tools required to assemble a system or prototype directly on the board quickly. Additionally, the TI SMARTDAC-DIY-EVM has the necessary interface to connect to various lab tools and measuring systems.

Features

  • Headers that are compatible with all smart DAC EVMs
  • SMA connectors for waveform and error testing
  • Variety of ports and connection spaces
  • Protoboard space
  • Application-specific breakout sections

Applications

  • Barcode scanners
  • Ultrasound
  • Laser pointer
  • LED biasing
  • Network interface card/ network switches

Hardware Block Diagram

Block Diagram - Texas Instruments SMARTDAC-DIY-EVM Evaluation Module

Layout

Texas Instruments SMARTDAC-DIY-EVM Evaluation Module
เผยแพร่แล้ว: 2566-11-15 | อัปเดตแล้ว: 2566-11-24