Texas Instruments PGA849EVM Evaluation Module (EVM)

Texas Instruments PGA849EVM Evaluation Module (EVM) provides access to the features and measures the performance of the PGA849 device. The Texas Instruments PGA849 is a precision, wide-bandwidth programmable gain instrumentation amplifier (PGA) for differential to single-ended conversion optimized to drive high-performance analog-to-digital converters (ADCs) with sampling rates up to 1MSPS without the need for an additional ADC driver.

Features

  • Quick and simple evaluation of the PGA849
  • Provides three shunt jumpers to set the PGA849 gain-control selection pins
  • Sub-miniature version A (SMA) connectors and test points allow for quick tests
  • The evaluation board incorporates an optional REF pin op-amp buffer for flexibility
  • Independent input and output power supply connections to allow for ADC input overdrive protection

Applications

  • Factory automation and control
  • Analog input module
  • Data acquisition
  • Test and measurement
  • Semiconductor test

Board Layout

Mechanical Drawing - Texas Instruments PGA849EVM Evaluation Module (EVM)
เผยแพร่แล้ว: 2567-09-13 | อัปเดตแล้ว: 2568-02-04