Texas Instruments LMR66430-2EVM Evaluation Module

Texas Instruments LMR66430-2EVM Evaluation Module is populated with the LMR66430MC5RXBRQ1, an easy-to-use, synchronous, step-down voltage converter. The LMR66430-2EVM supplies up to 3A of load current from an input voltage of up to 36V. The TI LMR66430-2EVM also provides an output voltage of 5V and a switching frequency of 2.2MHz.

The TI LMR66430-2EVM can support the complete LMR664x0-Q1 and LMQ664x0-Q1 family of devices by exchanging the default IC with other variants in the family, including the non-automotive grade devices.

Features

  • Fixed 2.2MHz switching frequency with external sync capability and mode select
  • Input, differential EMI filter for compliance testing
  • Wide input voltage range of 3V to 36V
  • Fixed 5V output, with optional feedback divider footprints

Applications

  • Advanced driver assistance systems: radar ECU
  • Infotainment and cluster: head unit, eCall
  • Body electronics and lighting

Layout

Texas Instruments LMR66430-2EVM Evaluation Module

Board Connections

Location Circuit - Texas Instruments LMR66430-2EVM Evaluation Module
เผยแพร่แล้ว: 2567-02-05 | อัปเดตแล้ว: 2567-05-14