Texas Instruments LM7472EVM Controller Evaluation Module (EVM)
Texas Instruments LM7472EVM Controller Evaluation Module (EVM) helps designers evaluate the operation and performance of the LM74720-Q1 and LM74722-Q1 ideal diode controllers in reverse battery protection applications. This evaluation module demonstrates how the Texas Instruments LM7472x-Q1 with integrated boost regulator for Low IQ and fast transient response controls two back-back N-channel power MOSFETs. It is done with an ideal diode MOSFET connected first, followed by a second MOSFET for switched output and power path cut-off.Features
- 12V and 24V automotive reverse battery protection
- Input operating range 3V to 40V, extendable to 65V
- 12V battery protection 3V to 40V
- 24V battery protection 3V to 65V
- 5A maximum load current with an option for 10A operation
- Switched output for power path cut-off
- Enable ON/OFF control
- Output voltage slew rate control
- LED Indication for output ON/OFF detection
- Onboard TVS protection for automotive transient immunity
Required Equipment
- Power Supplies
- One adjustable power supply 0V to 40V output, 0A to 10A output current limit
- Oscilloscope
- A DPO2024 or equivalent, three 10x voltage probes, and a DC current probe capable of measuring 10A
- Meters
- One Digital Multi Meter minimum needed
- Loads
- One resistive load or equivalent which can tolerate up to 10A DC load at 12V
Applications
- Automotive reverse battery protection
- ADAS domain controller
- Premium audio amplifier
- Camera ECU
- Head unit
- USB HUBs
- Power path protection, power mux, and ORing
Test Setup
เผยแพร่แล้ว: 2565-02-15