Texas Instruments DRV8220EVM Driver Evaluation Module (EVM)
Texas Instruments DRV8220EVM Driver Evaluation Module (EVM) allows for easy evaluation of the DRV8220 motor driver. The DRV8220 integrates an N-channel H-bridge, charge pump regulator, and protection circuitry. The device supports PWM (IN1/IN2), phase/enable (PH/EN), independent half-bridge, and parallel half-bridge control mode. The Texas Instruments DRV8220EVM is equipped with potentiometers that are used to set the duty cycle of the input control pins (PH/IN1, EN/IN2).Features
- 4.5V to 18V operating voltage range
- 1.7A peak output current
- Multiple control input interfaces
Design Files
Assembly View
เผยแพร่แล้ว: 2564-10-12
| อัปเดตแล้ว: 2565-03-11
