Texas Instruments DRV10987EVM Motor Driver Evaluation Module

Texas Instruments DRV10987EVM Motor Driver Evaluation Module (EVM) is a user-friendly evaluation kit demonstrating TI's fully integrated brushless motor driver, DRV10987. The evaluation module is a high-performance, power-efficient, and cost-effective platform that speeds development for a quicker time to market. The DRV10987EVM supports sensorless Brushless DC motors for a wide range of industrial applications and is suitable for 12V and 24V motors. This evaluation module can also support the overvoltage condition up to 45V.

Features

  • 6.2V to 28.0V Power supply voltage range
  • I2C Interface access registers for command and feedback
  • No external sense resistor or LDO required

DRV10987EVM Location Circuit

Location Circuit - Texas Instruments DRV10987EVM Motor Driver Evaluation Module
เผยแพร่แล้ว: 2560-11-28 | อัปเดตแล้ว: 2565-07-13