Texas Instruments DP83TG720EVM-MC Media Converter Evaluation Module
Texas Instruments DP83TG720EVM-MC Media Converter Evaluation Module (EVM) is designed to demonstrate the performance and unique features of the DP83TG720 Ethernet Physical Layer Transceiver. DP83867E, a standard Ethernet PHY, is connected to DP83TG720R-Q1 over RGMII to support connection with any standard 1Gbps device over Cat5e cable. The Texas Instruments DP83TG720EVM-MC also supports an onboard microcontroller for register access.Features
- Media converter: standard Ethernet to automotive single pair Ethernet
- RGMII
- Onboard MSP430 for register access
- 15m cable reach
Software
Block Diagram
เผยแพร่แล้ว: 2564-10-12