Texas Instruments DLP3010EVM-LC Evaluation Module
Texas Instruments DLP3010EVM-LC is a DLP® 3010 Light Control evaluation module in an easy-to-use platform for a wide variety of industrial applications. The device allows convenient synchronization with peripheral devices, supporting two configurable input triggers and one configurable output trigger. The DLP3010EVM-LC includes a DLP3010 (.3 720p) digital micromirror device (DMD), a DLPC3478 display and light controller, and a DLPA3000 PMIC/LED driver. The device offers a production-ready optical engine, resulting in a stellar combination of resolution, brightness, speed, and programmability in a small form factor.Features
- DLP3010, DLPC3478 configuration, and support firmware
- DLP3010, DLP 0.3 720p DMD
- DLPC3478, digital controller for the DLP3010 DMD
- DLPA2005, PMIC/LED Driver for the DLP3010 DMD and DLPC3478 controller
- Production-ready RGB LED optical engine from Eprotech
Kit Contents
- DLP3010, DLP 0.3 720p DMD
- DLPC3478, Light Control Controller for the DLP3010 DMD
- DLPA2005, PMIC/LED Driver for the DLP3010 DMD and DLPC3478 controller
- Production-ready RGB LED optical engine from Eprotech
- 1 HDMI cable
- 1 USB cable
- DLP3010, DLPC3478 Configuration, and Support Firmware
- Power supply sold separately
Block Diagram
เผยแพร่แล้ว: 2561-09-21
| อัปเดตแล้ว: 2568-03-05
