Texas Instruments DAC81416-08EVM Evaluation Module

Texas Instruments DAC81416-08EVM Evaluation Module is designed to easily demonstrate the functionality and versatility of the DAC81416 and DAC81408 DACs. The DAC81416-08EVM features the installed DAC81416. The TI DAC81416-08EVM offers on-board support for VDD (5V) and VIO (3.3V or 1.8V) through USB. Furthermore, the evaluation module has optional circuits and jumpers to configure the device for various applications. 

Features

  • On-board VDD (5V) and VIO (3.3V or 1.8V) support via USB
  • On-board FT4232 easily writes to the DAC using the DAC81416-08EVM GUI
  • Configurable circuit to evaluate the DAC81416
  • External SPI connections are available

Applications

  • Inter-DC interconnect (long-haul, submarine)
  • Inter-DC interconnect (metro)
  • Optical module
  • Semiconductor test
  • Lab and field instrumentation
  • Data acquisition (DAQ)

Kit Contents

  • DAC81416-08EVM board
  • USB micro-B plug to USB-A plug cable

Theory of Operation Block Diagram

Block Diagram - Texas Instruments DAC81416-08EVM Evaluation Module

Layout

Texas Instruments DAC81416-08EVM Evaluation Module
เผยแพร่แล้ว: 2567-09-10 | อัปเดตแล้ว: 2567-09-18