Texas Instruments bq77207EVM Evaluation Module (EVM)
Texas Instruments bq77207EVM Evaluation Module (EVM) is a complete evaluation system for the bq77207, a 3-series to 7-series cell Li-Ion battery protection integrated circuit. The circuit module includes one Texas Instruments bq77207 integrated circuit (IC), thermistor, and all other onboard components necessary to signal the condition from overcharge, over-discharge, and over-temperature in a 7-series cell Li-ion or Li-polymer battery pack.Features
- 3-series to 7-series lithium-ion protector with over-voltage, under-voltage, over-temperature, and open-wire protections
- Terminal blocks for input connection
- Active high outputs on header pins for evaluation
Required Equipment
- DC power supply, 0V to 32V at 250mA
- DC voltmeter
- Test leads to connect equipment
Basic Setup
เผยแพร่แล้ว: 2565-02-14
| อัปเดตแล้ว: 2567-01-04
