Texas Instruments bq76920EVM Evaluation Module
Texas Instruments bq76920EVM Evaluation Module is a populated circuit board for evaluation of the bq7692000 Analog Front-End along with the bq78350 Battery Management Controller. This serves as part of a complete pack monitoring and protection solution for 3 to 5-series Lithium Ion, Lithium iron phosphate, and more battery chemistries.The Texas Instruments bq76920EVM Evaluation Module provides a complete environment for evaluating register control of the AFE or the controller configuration and demonstrating the current control of a battery system.
Features
- Populated circuit board with
- bq7692000 AFE IC
- bq78350 battery management controller
- FETs for current control
- Test point patterns for easy evaluation
Kit Contents
- bq76920 circuit module
- Cable to connect the EVM to an EV2400 or EV2300 interface board
Required Equipment
- Test leads to connect equipment
- Electronic load or assorted resistors calibrated load or load with accurate current meter required for gauge evaluation
- Additional equipment may be desired to operate the bq76920 with a more extensive demonstration
EVM Connection for Basic AFE Operation
EVM Connection for Basic Gauge Operation
เผยแพร่แล้ว: 2563-04-13
| อัปเดตแล้ว: 2568-03-10
