Texas Instruments BQ76907EVM Evaluation Module
Texas Instruments BQ76907EVM Evaluation Module is designed to evaluate the BQ76907, a high-accuracy battery monitor and protector for Lithium-Ion, LiPolymer, LiFePO4 (LFP), and LTO battery packs. This module integrates low-side protection NFET drivers, a programmable LDO for external system use, and an I2C host communication interface supporting up to 400kHz operation. The BQ76907EVM module includes one BQ76907 IC, a sense resistor, one thermistor, and power FETs. This module is ideal for cordless power and garden tools, vacuum cleaners, non-military drones, and the industrial battery pack (2-series to 5-series).Features
- Complete evaluation system for the BQ76907 2-cell to 7-cell Li-Ion, LiPolymer, and LiFePO4 high-accuracy battery monitor
- Populated circuit module for 7-cell configuration for quick setup
- Power connections available on test points
- Communication is available with an included USB interface adapter or on 4-pin connector
- Resistor cell simulator for quick setup with only a power supply
- PC software available for configuration
EVM Connection for Basic Operation
เผยแพร่แล้ว: 2567-01-22
| อัปเดตแล้ว: 2567-02-19
