Texas Instruments ALM2402FQ1EVM Evaluation Module

Texas Instruments ALM2402FQ1EVM Evaluation Module is designed to provide access to the features and measure the performance of the ALM21402F-Q1. The ALM2402F-Q1 is an automotive-grade, dual high-voltage, high current Operational Amplifier (Op-Amp) with protection features from Texas Instruments.

Features

  • Access to the features of the ALM2402F-Q1 and measure the performance of the ALM2402F-Q1
  • Two default amplifiers configured in the inverting configuration with a gain of -2.5V/V

Overview

Texas Instruments ALM2402FQ1EVM Evaluation Module

Schematic

Schematic - Texas Instruments ALM2402FQ1EVM Evaluation Module
เผยแพร่แล้ว: 2562-10-16 | อัปเดตแล้ว: 2566-12-15