Texas Instruments ADC3683EVMCVAL ADC Evaluation Module (EVM)

Texas Instruments ADC3683EVMCVAL ADC Evaluation Module (EVM) is used to evaluate the ADC36XXQML-SP analog-to-digital converter (ADC). The ADC36XXQML-SP uses a serial low-voltage differential signaling (LVDS) interface to output the digital data. The serialized LVDS interface supports output rates up to 1Gbps. The Texas Instruments ADC36XXQML-SP can be operated in oversampling + decimating mode using the internal decimation filter to improve the dynamic range and relax the external anti-aliasing filter.

Features

  • Transformer coupled or single-ended clock inputs
  • Transformer coupled or single-ended analog inputs
  • FMC connector
  • Single 5V power supply jack for easy power-up
  • REF35160QDBVR Precision Voltage Reference for the ADC 1.6V external reference
  • REFBUF test point provides a hardware option to change the voltage reference

Kit Contents

  • ADC36xxEVMCVAL evaluation module
  • Mini-USB cable

Block Diagram

Block Diagram - Texas Instruments ADC3683EVMCVAL ADC Evaluation Module (EVM)
เผยแพร่แล้ว: 2567-02-15 | อัปเดตแล้ว: 2568-01-30